I have amassed over 19 years of significant, progressive experience in civil engineering projects within the construction Field. During my career I have participated in more than 10 civil engineering projects, all of them were successful.
My progressive engineering experience has provided me with the opportunity to develop strong client relation building skills and an ability to lead multi-disciplinary teams. I am experienced at applying the principles of civil engineering when planning, designing, and overseeing the construction and maintenance of structures and facilities.
• Develop Project scope, cash flow and delivery program for upcoming projects
• Handle Bidding process among competitive contractor prior to execution of contracts
• Coordinate with consultants and contractors regarding contract administration, project planning, design issues and resource management to complete the construction works in the stipulated time frame
• Interface with stakeholders including Vic Roads (State Government Highway agency), Local Councils, Utility services providers, Environmental agency, Community Groups and Unions regarding various project related issues
• Manage resolution of all issues during project construction, contract performance and commissioning phase
• Manage financial matters of the projects including Contractor’s claims, variations and project’s running cost
• Monitor the quality of construction and ensuring the implementation of project specifications, drawings and contract so that the works is complied with technical requirements
• Responsible for design coordination, construction, commissioning and as built to applicable standards to achieve client objectives
• Established monthly claim and progress regime for the construction works, conducted cost estimations and identified claim variances
• Interfacing with external project stakeholders including Local Councils, Service Authorities, EPA and Work cover regarding project related matters to ensure the completion of the construction works in the stipulated time frame
• Identified risks and developed mitigations plans, Risk Assessments and Safe Work Method Statements for construction Activities
• Coordinating with construction team in developing Inspection and Testing Plans (ITPs) and Project Quality Plans
• Advised the project manager regarding material and machinery costs, wrote daily detailed reports logging work progress for quality assurance purposes and accurately provided status information on project progress
• Reduced and controlled project expenses by improving resource allocation
• Facilitated processing of RFI’s (request for information) and submitting the general contractor, the Client and the Client’s consultants
• Submitted all project closeout documents in accordance with the contract and obtained notices of completion and compliance certifications from the construction administration consultants
• Liaised with the contractors regarding design issues, construction methods, project programmers and cost issues
• Managed financial matters of the projects including Contractor’s claims, variations and project’s running cost
• Supervised the quality of construction work and ensured that the executed work was complied with project specifications and drawings
• Established claim and works progress reporting regime for the running projects
• Developed Scope of works, Bidding documents and schedule of rates for federally funded projects
• Applied the contract documents and construction drawings for construction activities
• Developed project programming taking into account the critical path
• Dealt directly with foreman and sub-contractors during execution of projects
• Organised the production and installation of Precast Reinforced Concrete structural Panels including making of bar bending schedules for steel to be used in RC Panels, Concrete work having different mix design of RC panels attaining required comprehensive strengths and Installation of these panels with machinery including heavy cranes on specified positions as mentioned in construction drawings
• Coordinated with consultant and main contractor FWO regarding project related matters including project planning, design issues, resource management to complete the construction works in the stipulated time frame
• Supervised the works, 52Km in length of 6 RCC walls.
• Coordinated with client and contractor regarding project specific issues like provision of drawings,
• Supervised the construction works.
• Monthly Progress reporting to the client.
• Inspection of works and Approval from Consultant.
• Duties for the construction of the road supervision for the earth work and surface drainage system.
• Preparation for running bills by taking measurement from site as well as drawing and submission to the client for approval.
• Complete layout/ setting out of water supply and sewerage line, supervision for the construction of large tanks, brick masonry, plastering, flooring and all type of finishing work